Solving Fully Fuzzy Critical Path Analysis in Project Networks Using Linear Programming Problems
Journal Title: Scholars Journal of Physics, Mathematics and Statistics - Year 2015, Vol 2, Issue 2
Abstract
A new method for finding fuzzy optimal solution, the maximum total completion fuzzy time and fuzzy critical path for the given fully fuzzy critical path (FFCP) problems using crisp linear programming (LP) problem is proposed. In this proposed method, all the parameters are represented by triangular fuzzy number. The fuzzy optimal solution of the FFCP problems obtained by the proposed method, do not contain any negative part of the values of the fuzzy decision variables. This paper will present with great clarity of the proposed method and illustrate its application to FFCP problems occurring in real life situations.
Authors and Affiliations
M. Jayalakshmi
Lattice Points on the Homogeneous Cone 8(x^2+y^2 )-15xy=56z^2
The ternary quadratic equation 8(x^2+y^2 )-15xy=56z^2 representing a cone is analysed for its non-zero distinct integer points on it. Employing the integer solutions, a few interesting relations between the solutions and...
On the Non-Homogeneous Octic Equation with Five Unknowns ¬
The non-homogeneous octic equation with five unknowns represented by the diophantine equation is analyzed for its patterns of non-zero distinct integral solutions and two different patterns of integral solutions are illu...
The Proof and Application of Schwarz Integral Inequality
In mathematical analysis, Schwarz integral inequality is an important inequality. It is the basis for many inequalities. In this paper, six methods are given for proving Schwarz integral inequality. Furthermore, several...
Integer Points on the Hyperbola
The binary quadratic equation representing hyperbola is considered. Different patterns of solutions are obtained. A few relations between the solutions are exhibited.
On the Existence of Solutions to BSDES under Sublinear Grown Condition
In this paper, we study one-dimensional BSDE’s whose coefficient gis sublinear growth in z. We obtain a general existence result and a comparison theorem when g is linear growth in y and sublinear growth in z. Some known...