Study of Factors Causing Cost Overrun in Construction Industry Using AHP Technique: A Review

Abstract

Cost overrun has become a serious problem in construction sector. When the project could not be completed in estimated time at given budget then cost overrun occurs which is excess of actual cost over budget. These overruns have harmful impact on the financial system of country. Cost overrun have several factors that don't seem tobe taken into consideration at the time of planning resulting into delays and cost will increase. Within the study, we've got studied literature and known those factors influencing cost overruns. The primary findings emanating from the study disclosed that empirical studies have known variety of necessary factors that cause project cost overruns. These factors are categorized into several group depending on their category. It is found that understanding the cause of such factor by construction manager should help to avoid or minimize the cost overruns and gives better cost performance over the life of the project.

Authors and Affiliations

Shah Mohd Shahbaz, Sohit Agrawal, Dr. Mukesh Pandey

Keywords

Related Articles

Materials and Sustainability: the residual soil as an optimal construction material

This work aims to demonstrate the application of the process of geopolymerization to the manufacture of the soil-cement block (SCB) in order to obtain a geopolymerized soil block (GSB), since the production of soil block...

Logo Matching for Document Image Retrieval Using SIFT Descriptors

In current trends the logos are playing a vital role in industrial and all commercial applications. Fundamentally the logo is defined as it’s a graphic entity which contains colors textures, shapes and text etc., which i...

Modeling Mass-Spring-Damper System using Simscape

In this paper, the dynamic behavior of mass-spring-damper system has been studied by mathematical equations. Based on Newtonian mechanics, the mathematical model for a single mass-damper system is established. The transf...

Determination of the Optimal Path in Taxiways at Airports via the Probability Method

The problem of flights delay has been addressed in this article. A new program to help the air controller has been implemented. The main objective is to improve the airport performance ability to receive more aircrafts d...

Wind Speed Forecasting: A Review

Climate change causes serious impacts on the atmospheric such as violent storms, floods, fires, cyclones, acid rain and prolonged droughts. Nations of the whole world have been striving to achieve a sustainable developme...

Download PDF file
  • EP ID EP391591
  • DOI 10.9790/9622-0707048688.
  • Views 87
  • Downloads 0

How To Cite

Shah Mohd Shahbaz, Sohit Agrawal, Dr. Mukesh Pandey (2017). Study of Factors Causing Cost Overrun in Construction Industry Using AHP Technique: A Review. International Journal of engineering Research and Applications, 7(7), 86-88. https://europub.co.uk./articles/-A-391591