STUDY ON TIME AND COST MANAGEMENT IN CONSTRUCTION

Journal Title: International Journal of Civil Engineering and Technology - Year 2019, Vol 10, Issue 3

Abstract

In India large construction projects are inherently complex and dynamic. Many projects start with good ideas, huge investments and great efforts. However, most of them do not achieve much success. A major contribution to unsuccessful projects is the lack of understanding on scope, time, cost and quality. This project Projects as powerful strategic weapons when initiated create economic value and competitive advantage. The objective of the research is to explicitly declare the scope of the research to by considering only the scope, time, cost and quality as process success parameters and how specifically the cost element would influence the project success when all other elements or factors other than cost are represented in terms of cost factor along with the contract conditions as basic rules or constraints that drive the strategic cost based on applying the analysis methodology concept. The concept of benchmarking would provide right meaning of project success when allowing to properly distributing the meaning of customer profitability to the project providers (project owner and contractors). In this discussion, we emphasize the project management uses of accounting information. Interpretation of project accounts is generally not straightforward until a project is completed, and then it is too late to influence project management.

Authors and Affiliations

K. VENKAT RAMAN, P. DAYAKAR, R. VENKATKRISHNIAH and. A. MANI

Keywords

Related Articles

PARADIGMS FOR SHAPING URBAN DEVELOPMENT LANDSCAPES IN THE WORLD – A DIAGNOSIS OF THEIR FOCUS AND CHARACTERISTICS

Cities are centers of knowledge and sources of growth and innovation and possess exceptional possibilities for economic development. At the same time, however, the cities undergo certain transformation due to urbanizat...

STRENGTH STUDIES ON BIO CEMENT CONCRETE

This study investigates the effect of deploying Bio cement on mechanical properties of hardened concrete of Grade M25. Percolation of crack can lead to leakage problems causing concrete matrix deterioration or corrosio...

WOMEN AGAINST CEMENT: ENVIRONMENTAL ACTIVISM IN THE KENDENG MOUNTAIN RANGE OF CENTRAL JAVA INDONESIA

This article seeks to discuss the women’s environmental activism as manifested in their involvement in the contemporary anti-cement movement in the Kendeng Mountain Range of Central Java. Three major issues are dealt w...

IMPACT OF AL-COMPOSITES IN THE MANUFACTURING INDUSTRY: A NECCESSITY

In the engineering sector today, the need to substitute for orthodox materials like wood, aluminium, steel and concrete, has led to the invention of raw materials that meet specific needs like hardiness-to-mass ratio,...

INCREASING THE BASE LOAD-BEARING CAPACITY STACKED WITH SOIL TYPE II ON COLLAPSIBILITY

Phenomena of collapsibility should be considered as hazardous geological processes and construction on such soils requires special attention. The main aim of the research is to find a technical solution for eliminating...

Download PDF file
  • EP ID EP46394
  • DOI -
  • Views 181
  • Downloads 0

How To Cite

K. VENKAT RAMAN, P. DAYAKAR, R. VENKATKRISHNIAH and. A. MANI (2019). STUDY ON TIME AND COST MANAGEMENT IN CONSTRUCTION. International Journal of Civil Engineering and Technology, 10(3), -. https://europub.co.uk./articles/-A-46394