The Reorganization of the Traffic in the city of Opole during the Renovation of Niemodliński Bridge

Journal Title: Logistics and Transport - Year 2016, Vol 29, Issue 1

Abstract

In the near future the city of Opole, as well as the whole Opole Voivodship are going to suffer from a serious problem connected with the traffic system which provides for closing of the core bridge crossing from one part of the city to another one – the Ulga canal. The condition of the bridge crossing at Niemodlińska Street is constantly deteriorating. After the first expertise had been conducted by a construction supervision, the decision to close the bridge on 1st June 2015 was made. The decision is justified by the safety reasons and disastrous technical state of the bridge crossing. In order to delay the moment of the closing and lighten the bridge, the inside lanes were changed into bus lanes and thereby the centre of gravity has been moved closer to the bridge crossing axis. Cars are going to use outside lanes. In front of the bridge vehicles height limiters were set in order to eliminate trucks from the traffic. For this kind of vehicles a special detour was created (Wrocławska Street, Road No 45). After this procedure the next expertise of construction supervision was conducted whereby the exclusion of the bridge from the traffic was delayed for one year. For the time being, it is known that the third expertise is being prepared. During the bridge renovation the car drivers and public transport passengers who travel to work every day are going to come across the serious communication problem.

Authors and Affiliations

Wojciech Kozłowski, Krystian Oleś, Denis Buchta, Adrian Maślanka, Tomasz Marzec, Bartosz Olejnik

Keywords

Related Articles

Criminal Law and Institutional - Managerial Aspects of Ensuring Safety in Rail Traffic. Selected Problems

This article offers insights into criminal law aspects of rail accidents on the ground of 4 E theory. The authors show correlations between offences against safety in transport and criminal repercussions of this incident...

Assessment of the Acoustic Microclimate in the Zone of the Switch Unit in the Heavy Roller Conveyor Line – Case Study

The sign of the so-called human engineering policy introduced in the industry is decreasing the occupational hazards and making the workplaces as comfortable as possible. That tendency finds expression in the tightened i...

Modelowanie symulacyjne linii produkcyjnej oraz optymalizacja produkcji pod względem wykorzystania środków transportu wewnętrznego

Article describes the project in the production process and results in an establishment BOSCH braking systems in Poland and in the establishment Twardogórze GKN Automotive Poland in Rudolf. Objective of the project in BO...

Die Sicherheit des Gefahrgutverkehrs

Implementation of dangerous cargo transport carried out by road traffic is very important for production and transport in aspect of the procurement. The first part of the article presents hazards of dangerous goods trans...

Evaluation of the economic situation and freights in the countries of Central and Eastern Europe in 2002 - 2007

The article comprises an analysis of economies of eight Central and East European countries (CEE) in 2002-2007. Basic macroeconomic indexes (GDP, unemployment rate, inflation rate, total demand, public sector financial d...

Download PDF file
  • EP ID EP491946
  • DOI -
  • Views 53
  • Downloads 0

How To Cite

Wojciech Kozłowski, Krystian Oleś, Denis Buchta, Adrian Maślanka, Tomasz Marzec, Bartosz Olejnik (2016). The Reorganization of the Traffic in the city of Opole during the Renovation of Niemodliński Bridge. Logistics and Transport, 29(1), 47-56. https://europub.co.uk./articles/-A-491946