Toe Load Detection and Test Verification Based on the Natural Frequency of Fastener Elastic Rod
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 9
Abstract
Objective The insufficient toe load of the fastener elastic rod will induce loosening of the surrounding fasteners, aggravate the dynamic response between wheels and rails, affecting the service life of the track components. Compared with the missing and breaking of the fastener elastic rod, fastener elastic rod loosening is more difficult to be spotted by routine manual inspection, so the toe load detection method of the fastener elastic rods needs to be studied. Method Taking WJ-7 fastener elastic rod of high-speed railway as an example, a refined model of fastener system is established, the modal characteristics of fastener elastic rod under different toe load states are analyzed, corresponding relationship between the toe load of fastener elastic rod and the natural frequency is obtained, and a rapid non-destructive testing method for calculating the toe load by testing the modal frequency of elastic rod is proposed accordingly. The high-speed railway line at the track test base of a State Key Laboratory is selected as the test site, and the test verification of the detection method is carried out. Result & Conclusion Under different toe load states, the 1st modal shape characteristics of elastic rods all manifest as vertical vibration and torsion on both side legs of the elastic rod. The maximum absolute value of the difference ratio between the simulation value and the measured value of the elastic rod 1st order natural frequency is 3.24%, so the test method can be considered as effective.
Authors and Affiliations
Zhengxiang DING, Ziwen CAO, Mingjia LIU, Linya LIU, Zheng WEI, Zhequan HU, Rui SONG
Characteristics and Applicability Analysis of Flexible Scheduling for Urban Rail Transit Crews
[Objective] In view of the situation that the flexible crew scheduling method commonly used in foreign metro systems is barely applied in China, the applicability of flexible scheduling in Chinese metro system and the ma...
Insulation Protection Tests and Safeguard Measures under Equipotential Connection of Platform Door and Steel Rails
Objective Under the equipotential connection method between platform door system and steel rail, once the ground insulation of the platform door system weakens, the discharge is prone to occur. In order to ensure passeng...
Engineering Application of Calculation for Interval Protection Distance between Virtual Marshalling Trains in Urban Rail Transit
[Objective] The operation of virtual marshaling trains (abbreviated as V-train) in urban rail transit meets the construction requirements for green energy conservation and green intelligence integrated development proj...
Review of Ground Deformation Caused by Earth Pressure Balanced Shield Construction
[Objective] During the process of EPB SC (earth pressure balanced shield construction), inevitable soil disturbances occur, causing ground deformation and subsequently impacting the surrounding built environment negative...
Influence of Body-suspended Drive System on Dynamic Characteristics of High-speed Train
[Objective] As the power source and force transmission component of rail transit vehicles, the drive system influences the dynamic characteristics of the vehicle system to a certain extent. Therefore, it is necessary t...