Using Overall Equipment Effectiveness indicator to measure the level of planned production time usage of sewing machine

Journal Title: Production Engineering Archives - Year 2014, Vol 0, Issue 4

Abstract

The chapter presents the results of utilization of the OEE indicator to measure the level of operating time usage of sewing machine production of air bags. The idea of an OEE indictor, which is a key metrics in Total Productive Maintenance (TPM) program, is presented. The goals and benefits of its calculation are included. The research object – KL 110 air bags sewing machine - what for the machine is used. The calculation of TPM indicators for the analysed machine is presented. The calculation of TPM indicators was undertaken over a period of six months of the machine’s working time. It was indicated that the overall effectiveness of the machine is at a level of 65,7%, the time loss-es were 34,3%. Most of the losses were related to low performance. Only Availability indicator reaches a word class level, if other indicators such as Performance, Quality and OEE should be improved, their value should be increased. Activities to improve the effectiveness of the machine utilization were determined.

Authors and Affiliations

Marek Krynke, Krzysztof Mielczarek

Keywords

Related Articles

The enterprise constant improvement by using medium ratings differentiation analysis on the second Toyota principle

The organization constant improvement process is possible using a step by step method. The self-learning organization and con-tinuous improvement of the organization's culture guarantees achievement of good market result...

Applying the 5 Why method to verification of non-compliance causes established after application of the Ishikawa diagram in the process of improving the production of drive half-shafts

The automotive industry is one of the most important branches of the global industry. For this purpose, products are produced by an extensive network of suppliers. They supply components directly to the (OEM - Original E...

COMPARISON OF LOW AND HIGH FREQUENCY FATIGUE TESTS

The paper presents the results of low and high frequency fatigue tests carried out on nodular cast iron. The specimens of synthetic nodular cast irons from three different melts were studied in the high cycle fatigue reg...

METHODS OF MEASURING THE EFFECTIVENESS OF LEAN MANAGEMENT

Invalid organisation of the production environment in an enterprise is the cause of many disruptions during the implementation of production processes. Lean Management is aimed at improving processes and eliminating inte...

Influence of long-term heating on the fatigue properties of low-alloyed cast steel STN 42 2707

In this paper the authors publish own experimental results of examination of low-alloyed cast steel STN 42 2707 fatigue properties (near- threshold regime of fatigue crack propagation for rates from da/dN =5.6x10-9m.cycl...

Download PDF file
  • EP ID EP168638
  • DOI -
  • Views 88
  • Downloads 0

How To Cite

Marek Krynke, Krzysztof Mielczarek (2014). Using Overall Equipment Effectiveness indicator to measure the level of planned production time usage of sewing machine. Production Engineering Archives, 0(4), 6-9. https://europub.co.uk./articles/-A-168638