Zejście pod ziemię. Część 2 - przykłady realizacji.

Journal Title: Builder - Year 2018, Vol 251, Issue 6

Abstract

Modern solutions arising from the “going underground” of buildings in cities. This article presents the technologies most commonly used today in th construction of deep undergrounds. Two examples have been discussed in detail. The first concerns an office building with three underground floors located in the vicinity of the metro station and pre-war tenement houses. The second example discusses the execution of the deep excavation in geotechnical conditions of high ground water level in the absence of the possibility to perform the dewatering of the construction site. In the first case, diaphragm walls and jet-grouting below the existing foundations were used. The influence of the excavation on neighboring buildings was analyzed and expected settlements of foundations were determined. In the second example the method of underwater concreting is described.<br/><br/>

Authors and Affiliations

Anna Siemińska - Lewandowska

Keywords

Related Articles

Brama Poznania architektura i konstrukcje w symbiozie. Część 1.

The „Gate of Poznan” is one of the most unorthodox buildings accomplished in Poland in the last years. It was designed on the basis of the winning project of the international architectural competition. Our team of struc...

Belki z okrągłymi otworami. Część 1.

Celem artykułu jest porównanie różnych sposobów analizy nośności belki stalowej z otworami okrągłymi w aspekcie projektowania konstrukcji. Zwrócono uwagę na model zniszczenia związany z mechanizmem Vierendeela oraz utrat...

Download PDF file
  • EP ID EP641398
  • DOI -
  • Views 110
  • Downloads 0

How To Cite

Anna Siemińska - Lewandowska (2018). Zejście pod ziemię. Część 2 - przykłady realizacji.. Builder, 251(6), 46-49. https://europub.co.uk./articles/-A-641398