A New Approach to Estimating the Occupation Time of the Railway Infrastructure

Journal Title: Transport - Year 2010, Vol 25, Issue 4

Abstract

The paper describes UIC methodology and a technique used by Slovakian infrastructure managers for estimating railway capacity and proposes a new approach to evaluating the capacity consumption of a track line (occupation time) based on the graphic approach. The new methodology concerns for the assessment of infrastructure occupation time and is a conceptual framework developed by the authors for an easier evaluation of occupation time in the train traffic diagram.

Authors and Affiliations

Jozef Gašparík, Vladislav Zitrický

Keywords

Related Articles

RSU Localization Model and Simulation Optimization for VII Network

While facing the needs for Vehicle Infrastructure Integration (VII) applications in traffic management, the paper deals with the problem of locating Road Side Units (RSU) for VII deployment. After analyzing the differenc...

Fuzzy Renewal Theory about Forecasting Mistakes Done by a Locomotive Driver: A Serbian Railway Case Study

The human factor is one of the most dominant causes of railway accidents. For example, human impact appears to be the main reason for 44% of railway accidents in the Republic of Serbia. Thus, a remarkable effort is under...

Analysis of Microscopic Data under Heterogeneous Traffic Conditions

Collecting microscopic data is difficult under heterogeneous traffic conditions. This data is essential when modelling heterogeneous traffic at a microscopic level. In this paper, microscopic data collected under heterog...

The Safety of Tankers and Single Point Mooring During Loading Operations

Single point mooring (SPM) is used when typical port facilities cannot be applied. Offshore platforms and terminals producing oil and gas are the places where SPM can be employed. Accidents with SPM equipment and ships o...

Productivity of a Gasodynamic Loosener

Maximum loads for a semi plane weakened by an aperture under uniform pressure were investigated for elaborating a mechanism for frozen ground destruction applying a recently designed loosener. Recommendations concerning...

Download PDF file
  • EP ID EP85181
  • DOI 10.3846/transport.2010.48
  • Views 152
  • Downloads 0

How To Cite

Jozef Gašparík, Vladislav Zitrický (2010). A New Approach to Estimating the Occupation Time of the Railway Infrastructure. Transport, 25(4), 387-393. https://europub.co.uk./articles/-A-85181