Abstract

Objective Due to the special construction method of overlapping tunnels, the formation of land subsidence troughs and the increase in stratum loss rate may affect the surrounding environment and buildings. Therefore, it is necessary to study the influence law of land subsidence in overlapping tunnel construction. Method Taking the completely overlapping tunnel section of Qinghe Xiaoyingqiao Sta.–Xuezhiyuan Sta. Interval on Beijing Subway Changping Line as example, combining numerical analysis and on-site monitoring data, a systematic study of land subsidence and stratum loss during shield overlapping tunnel construction is conducted. The impact of the construction sequence of the upper and lower line tunnels on the morphology of land subsidence troughs, the maximum subsidence values, and stratum loss rates is analyzed. Result & Conclusion There is a significant superposition effect in shield overlapping tunnel construction. The construction of upper line tunnel causes some amount of stratum loss and leads to an increase in the maximum land subsidence value. Under overlapping construction conditions, the stratum loss caused by the excavation of upper line tunnel is less than that caused by the separate construction of upper line tunnel without involving the overlapping construction situation. The stratum loss rate during overlapping tunnel construction is not affected by changes in tunnel buried depth, and there is little difference in stratum loss rate between single-line excavation and overlapping excavation. In similar geological conditions to this engineering, the stratum loss rate can be roughly estimated at 0.25%.

Authors and Affiliations

Zhendong LI

Keywords

Related Articles

Stability Analysis of Jinan Qixiuchang Metro Station during the Foundation Pit Temporary Supports Dismantling

Objective It is prone to lose stability, affecting the engineering safety in the process of dismantling the supports for metro station deep and large foundation pit. Therefore, it is necessary to analyze the stability in...

Influence Analysis of Newly-built Channel Foundation Pit Under-passing High-Speed Railway Bridge on Adjacent Piers

[Objective] When a new channel foundation pit under-passes a high-speed railway bridge, the excavation and unloading of the foundation pit will cause the displacement of the soil surrounding the bridge, and further affec...

Construction of Urban Rail Transit Line Spatial Digital Base Using 3D Laser Point Cloud Technology

Objective In order to facilitate the digital transformation and high-quality development of Shanghai rail transit, it is imperative to construct a digital twin model and create a unified, authoritative, and precise spati...

Urban Rail Transit Regional Collaborative Management Mode Based on Shanghai Resilient City Construction

Objective The regional collaborative management of urban rail transit (URT) is explored to assist in the construction of Shanghai resilient city. Research is carried out specifically on the collaborative management mode...

Effect Analysis of Track Vibration Reduction Measures on Viaduct Environmental Vibration Induced by Vehicle Operation

[Objective] When a train running on the viaduct track, the rail vibration caused by the vehicle-track interaction will be transmitted to the bridge, piers, and pile foundations through the track structure, thereby trig...

Download PDF file
  • EP ID EP742601
  • DOI 10.16037/j.1007-869x.2024.07.017
  • Views 26
  • Downloads 0

How To Cite

Zhendong LI (2024). Analysis of Land Subsidence Induced by Vertical Overlapping Tunnel Shield Construction. Urban Mass Transit, 27(7), -. https://europub.co.uk./articles/-A-742601