Assessment of Performance of Functional and Partial Functional Water Supply Systems in Sunsari District of Nepal
Journal Title: Journal of Advanced Research in HR & Organizational Management - Year 2019, Vol 6, Issue 1
Abstract
Only 25.4% of water supply projects are fully functional in Nepal though the target of government is to provide access to safe water supply and sanitation facilities for all. Therefore a study for comparing the performance of the functional (Itahari) and partial functional (Duhabi) water supply and sanitation project after management transfer is needed to assess the indicators to improve the status of water supply and sanitation projects. Both the projects are of Sunsari district.Purposive Sampling technic was applied based on sample size of central limit theorem. Scheduled Questionnaire Survey, Expert Consultation, Focus Group Discussion and Water Sample Test were done for primary source of data whereas reports. Journals, project reports, similar studies, books, websites and audit reports were reviewed for secondary source of data. Comparative performance of both the projects was analyzed based on technical, financial and institutional indicators. From the study it was found that pressure of flow, water demand of users, chlorine demand, and quick response of staffs, water quality and open defecation free were maintained at Itahari whereas such features were lacking in Duhabi Water Supply and Sanitation Project. It was found high tariff rate, timely payment and a business plan of Itahari WSSP was better resulting into better financial performance of the system in comparison to that of Duhabi.Based on policy in both water supply and sanitation projects 33% of women along with a vital post and marginalize group based on service area representation were found. In Itahari Water Supply Project, for per thousand of connection 3.66 staffs were appointed whereas in partial functional Duhabi Water Supply System 1.91 staffs were found for per thousand connections. Itahari WSSP had maintained a citizen charter, complaint box, information system, detailed design report, As Built Drawings, Standard Operating Process and project information’s were documented which causes the management of the system effective for implementation of reliable and satisfactory of the system whereas these things need to be improved in case of Duhabi for creating the confidence about the service
Authors and Affiliations
Anjay Kumar Mishra, Arun Kumar Karna, Narayan Dhakal, , Tulika Jha
Digital Literacy-Practice among Academicians: A study conducted in a B-School
Introduction of technology in Indian education system emerged comparatively late but given the accessibility to internet at affordable pricing it is creating a synergistic environment for the digital literacy among the e...
Closing Bell: Examining the relevance of Bell Curve
Through this study, we have explored the various expects of bell curve system of performance appraisal such as fairness, transparency, linkage to goals and efforts, its perceptions of the bell curve system of performance...
Safe and Healthy Workplace
Safe and healthy workplace play an important role to increase efficiency, quality and productivity. Under this research consequences of an unsafe work environment were found. The major goal of this paper was to develop v...
Workplace Humour Styles and Subordinate Work Attitudes of Telecommunication Companies
We in this study, sought to examine the empirical link between workers humour style and subordinate work attitudes in Telecommunications Companies Port Harcourt. The population of the study consists of 137 Employees in f...
Job Design and Quality of Work-life in Telecommunication sector in Port Harcourt
The study sought to establish an empirical link between job design and the quality of work-life of employees in five selected manufacturing companies in Port Harcourt Nigeria. The study utilized both descriptive and infe...