Abstract

Objective Over-excavation in tunnel construction, mainly caused by inappropriate blasting,will affect the smooth progress and safety of tunnel excavation, increase construction cost and reduce economic benefits. In order to radically solve this problem, blasting design and blasting construction technology should be studied and optimized. Method Based on the shallow buried unsymmetrical pressured layered railway tunnel project for Chongqing Railway Hub East Ring Line(Chongqing East Ring Railway),the causes of vault, arch haunch and arch foot over-excavation are analyzed with theoretical method and modern computer technology. The drilling positions are designed with dynamic optimization, and control measures and solutions for over-excavation are put forward. Result & Conclusion Over-excavation at the tunnel vault is mainly caused by the secondary disturbance of the surrounding rock in smashed area by mechanical excavation after blasting, and over-excavation at the arch waist and arch foot is mainly caused by the improper amount of blasting explosive and improper drilling. In addition, the existence of rock cracks will also lead to significant decrease of the surrounding rock strength. Therefore, proper blasting and under-excavation should be done at the vault to reduce the disturbance of the surrounding rock, and then manual + mechanical excavation and trimming should be combined to reduce the amount of over-excavation. Secondly, according to the attributes of surrounding rock, and based on GA-SVR model and genetic algorithm, the blasthole spacing is properly optimized. On-site monitoring results show that in the initial stage without optimized blasthole spacing, the over-excavation in cracked stratum is about 40cm, which is reduced to about 9cm after the blasthole spacing optimization. The results indicate that optimizing the blasthole spacing can effectively control tunnel over-excavation. The above results can provide reference for similar projects.

Authors and Affiliations

Fengjie YUAN, Haoqian WANG, Guanping SONG, Lang YUAN, Hang GAO, Qianwei XU

Keywords

Related Articles

Influence Analysis of Super-large Diameter Steel Pipe Pile Resonance-free Method Construction on Surrounding Soil Deformation

Objective The high-frequency resonance-free method is renowned for its high efficiency and low environmental impact. To further investigate the influence of constructing super-large diameter steel pipe pile with this met...

Detection System Design and Implementation for Foreign Objects in Automatic Platform Door Gap

Objective The detection of foreign objects in platform door gap is critical to metro operational safety. Therefore, it is essential to develop a new anti-clamping detection system for metro platform door, enhancing the s...

A Design for Guideway Rubber-tyred Tram Vehicle Base without Turn-back Operation

Objective Vehicle base serves as a place for parking and maintenance of guideway rubber-tyred trams. Vehicles are traveling on complex routes and operating turn-back frequently within the base. Since guideway rubber-tyre...

Adjustment of Nantong Urban Rail Transit Network Planning after Introducing Important Regional Transportation Infrastructure

Objective Under the background of regional integration of Yangtze River Delta, the introduction of important regional transportation infrastructures such as the new airport (hub) station in Nantong will not only greatly...

Study on Anti-overturning Characteristics of 60R2 Groove Rail and CHN60 Rail for Fastener Type Ballastless Track of Tram

Objective In order to provide theoretical support for the selection and design of the tram rail and fasteners in different sections, it is necessary to study the anti-overturning characteristics of the 60R2 groove rail a...

Download PDF file
  • EP ID EP737772
  • DOI 10.16037/j.1007-869x.2024.06.043
  • Views 54
  • Downloads 0

How To Cite

Fengjie YUAN, Haoqian WANG, Guanping SONG, Lang YUAN, Hang GAO, Qianwei XU (2024). Construction Optimization of Shallow Railway Tunnels under Unsymmetrical Pressure for Reducing Blasting Over-excavation. Urban Mass Transit, 27(6), -. https://europub.co.uk./articles/-A-737772