Abstract

Reliability Centered Maintenance (RCM) as one of the processes that used to decisive action which should be performed to ensure any physical components or a system can work optimally in accordance with the function desired by its users. Basically, RCM used a risk management principles of the failure of the components so that it can be determined the type of maintenance properly. With the appropriate type of maintenance, then the failures that may occur can be prevented at once to be able to be detected before they occur. Appropriate implementation of RCM, capable of delivering cost savings, the impact on both the cost of maintenance as well as repair costs due to the occurrence of failure. In this paper, the components become the object of research is the main engine of the KT. X tugboat belongs to Pelindo Marine Service (PMS) Surabaya. KT. X tugboat has the lowest level of availability of the entire company-owned tugboat 80.01 percent. Tugboat is one of the main assets of PMS who support the economy of the company. Therefore, it is imperative for a company to further enhance the efficiency of activities of its operations. These include the efficiency of human resources, as well as economic analysis of system reliability of company assets. It is used in order to keep abreast of competition at the world maritime national and globally. Implementation of RCM process on main engine KT. X, priority levels can be specified against the failure of components that have critical consequences. So it can be a planned maintenance system generated properly and efficiently.

Authors and Affiliations

Dwi Priyanta, Muhammad Badrus Zaman, Apriagung Diantana P

Keywords

Related Articles

Booster Pump Performance Analysis Towards Rotation Of Impeller For CSD Dredger Type

Dredger are a vessel for lift materials from sub surface to another place above the water surface. Dredger divided into some types such Suction Dredger, Bucket Dredger, Backhoe Dredger, and Water Injection Dredger. Cutte...

Development of Power Management System for Electric Power Generation in Tanker Ship Based on Simulation

Power management system (PMS) for electric power generation in ship, in the case of tanker ship, is the system that has function to control and to monitor all generators in ship as the main electricity supplier for all e...

Automatic Stacking Crane Prototype using Microcontroller Arduino Mega 2560

The port is one of the supporting infrastructures for sea-transportation carrying goods and passengers. The function of port is important in supporting the transportation system to develop economic, social, and eduaction...

Technical Overview Of Biogas Utilization as Fuel of Boat Engine

The depletion of world energy reserves and the increasing levels of environmental pollution, increase human creativity. Discoveries on environmentally friendly renewable energy-making technologies are increasingly widesp...

Analysis of Electrical Power Consumption in Container Crane of Container Terminal Surabaya

Container crane electrification is a re-powering process of container cranes from diesel to electricity. In electrification process, it is required an analysis of electrical power consumption that is needed in the operat...

Download PDF file
  • EP ID EP247662
  • DOI 10.12962/j25481479.v2i1.2704
  • Views 235
  • Downloads 0

How To Cite

Dwi Priyanta, Muhammad Badrus Zaman, Apriagung Diantana P (2017). Maintenance Task Allocation And Planning In KT. X Tugboat Using Reliability Centered Maintenance Method. International Journal of Marine Engineering Innovation and Research, 2(1), 59-69. https://europub.co.uk./articles/-A-247662