MANUFACTURING ENGINEERING PROCESSES FOR OFF-ROAD BUGGY’S FUEL TANK PRODUCTION

Abstract

In automotive industry pre-production design and developing a prototype is major substance to enhance the quality and productivity of the process. There is lot of software packages available to simulate the production plan virtually and analyses the bottlenecks, waiting time, lead time and process outcome without spending more cost and time rather taking make and break decisions. Software simulations are the best way to improve the production plan and design by trial and error. In this paper, production plan of a fuel tank used for off-road buggy is solely designed and analyzed with value stream mapping, initially the production plan designated to make 200 fuel tanks per week using man power resources and the demand increased to 2000 tanks per week which lead to implement the automation for the process. The production floor is divided based on the process which is to be carried to make the fuel tank that begins with blanking, continuing folding, welding, final welding and inspection. The total KPI for the 200 fuel tanks per tank found out to be 91. 49 minutes due to manual production process and for 2000 tanks per week found to be 17.16 minutes. Activity utilization charts are also included to show the difference in working span in traditional manufacturing process and automated manufacturing. As the manufacturing is flexible cell, the shop floor design was not changed to reduce the investment.

Authors and Affiliations

PRAVEEN PADAGANNAVAR

Keywords

Related Articles

MANUFACTURING ENGINEERING PROCESSES FOR OFF-ROAD BUGGY’S FUEL TANK PRODUCTION

In automotive industry pre-production design and developing a prototype is major substance to enhance the quality and productivity of the process. There is lot of software packages available to simulate the production pl...

Automatic Tyre Inflation System in Dynamic Condition

In today’s growing world, the possibilities of road accidents of any automobile are increasing at an alarming rate. The reasons for these happenings are the puncturing of tyres, when the vehicle is at very fast speeds du...

The Investigation of the Wear Condition of Spur Gearbox under Variable Loads using Wear Debris Analysis Technique

The wear is a very common phenomenon during the meshing of the gears. The development and progression of the wear in gears may create catastrophic failures. In this study, the progression of wear condition in the gear ha...

The Simulation of Three-Dimensional Heat Transfer Through an Insulated Pipe by Variation of Solver Parameters

Conjugate heat transfer (CHT) involves three types, namely conduction, convection and radiation. Where conduction is the fastest mode of heat transfer. This formulation of heat transfer is governed by...

Design and Performance Optimisation of the Steering System of a Vehicle

The steering system is the most vital element in any automobile. It helps the driver to keep control on the manoeuvring of the vehicle and it also provides stability to it. The major problems during design in Steering Sy...

Download PDF file
  • EP ID EP221660
  • DOI -
  • Views 115
  • Downloads 0

How To Cite

PRAVEEN PADAGANNAVAR (2017). MANUFACTURING ENGINEERING PROCESSES FOR OFF-ROAD BUGGY’S FUEL TANK PRODUCTION. International Journal of Automobile Engineering Research and Development (IJAuERD), 7(1), 7-18. https://europub.co.uk./articles/-A-221660