Mechanical Behavior of Urban Rail Transit Station Structure Based on Existing Shield Tunnel Interval Underground Excavation Construction
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8
Abstract
Objective Cancer Hospital Station on Shenzhen Rail Transit Line 14 adopts a scheme of large-diameter (8.5 m) shield tunnel expansion featuring tunnel-first and station-later. During the connection of the main station structure and auxiliary entrances in underground excavation, the construction of large local openings in tunnel lining is required. To ensure the structural safety during tunnel opening construction, it is necessary to study the mechanical behavior of urban rail transit station structure based on existing shield tunnel interval underground excavation. Method To simulate the station underground excavation process under various working conditions, a multi-ring shell-rigid beam-contact lining calculation model considering the effects of lining structure circumferential and longitudinal joints is adopted. The scenarios include full-opening lining ring control condition (opening condition) and half-opening lining ring control condition (support removal condition). Key design parameters, such as the position of capping block, the forms of internal support, and the dimension of tunnel longitudinal opening, are analyzed for their impact on station structure. Result & Conclusion Based on the stress characteristics of ring beams, it is recommended to use steel or embedded steel components for the upper and lower ring beams in the design. It is recommended that the arrangement of through-joint assembled segments in the opening area should be adopted according to segment stress characteristics, and the capping block of tunnel opening section through-joint assembled segments be designed at the tunnel top for Cancer Hospital Station. The bending moment distribution of opening lining ring segments throughout construction process is closely related to the effective constraint points of internal supports, and the premise of internal supports forming effective constraint is a complete axial force transmission path. The integrity of opening lining ring structure is contingent upon the lateral constraints of circumferential joints during the local tunnel opening construction.
Authors and Affiliations
Zhongan ZHANG, Ye PAN, Zhenkun GUO, Jiaolong ZHANG, Yimin GAO, Xian LIU
Disturbance Deformation Influence and Field Measurement Study of Metro Shield Under-passing High Building Foundation
Objective With an increasing number of cases involving metro shield tunneling through or in proximity to high buildings in urban rail transit projects, the shield tunneling method inevitably causes disturbances to the gr...
Application of DC Power Supply Air-conditioning Units in Urban Rail Transit Vehicles
[Objective] Currently, air-conditioning units in urban rail transit vehicles predominantly use an AC (alternating current) 380 V power supply mode, which requires two power conversions before reaching the end-use equip...
Research on Real-time Wheel-rail Force Identification Network of Rail Transit under Compound Line Conditions
Objective Wheel-rail force plays an important role in the study of train running state, wheel off roundness and rail corrugation in rail transit. Current wheel-rail force identification methods have some problems, such a...
Research on Station Passenger Flow Organization Model Based on Temporal Knowledge Graph
Objective Urban rail transit stations are facing the challenges of increasing passenger flow pressure and insufficient intelligent means. To improve the efficiency and intelligent level of passenger flow organization in...
Research on the Train Surface Pressure Characteristics in Passing through Tunnels at Speeds of 400 km/h and above
[Objective] In order to ensure the running safety of trains with a speed of 400 km/h and above when passing through tunnels and improve the passenger ride comfort, it is necessary to adopt the numerical simulation meth...