Model for calculating the expected cost of new rocket hardware development with account for uncertainty factors

Abstract

Rocket hardware represents technically complex expensive and unique engineering systems. At present, de-cisions on the advisability of implementation of new pocket hardware development projects are made based on financial feasibility study materials with the use of the benefit–cost or cost–efficiency criterion without even rough quantitative estimates of cost overrun or efficiency reduction risks. The methodological approach presented in this paper is a first stage in the development of mathematical methods and algorithms for calculating the expected engineering and economical performance characteristics of new rocket hardware development projects with account for risks. This paper proposes an econometric model for calculating the expected cost of new rocket hardware devel-opment and assessing the risk of cost overrun and delay in the development work. The mathematical model is based on an analytical relationship between the required performance characteristics of a new rocket product and its cost parameters. To make the expected cost calculation and cost overrun risk assessment method more formal, the technical structure of a rocket system is represented as a weighted directed tree graph. The graph vertices are the rocket system itself (the root vertex) and its components. The graph arc weights are sequence of the engineering and economical performance characteristics of the lower-level component included in the nearest vertex of the tree graph. The risk of expected cost overrun and delay in the development work is due to uncertainty in the input data used in the calculation (the variables and the parameters of the econometric model). The data uncertainty is modeled using the fuzzy set theory: the model variables and parameters are represented as fuzzy triangular numbers.

Authors and Affiliations

V. Marchenko, N. Sazina, P. Khorolskyi, A. Voznenko

Keywords

Related Articles

Chemical and explosion- fire safety of spillage of propellant components at launching rocket com-plees

It is shown that the improvement of chemical and explosion-fire safety of spillage of propellant components due to accidents at the launching complexes during the launch preparation is provided by dispersed flows of th...

Making and properties of magnetron chrome coating for working surface of titanium actuating hydraulic cylinder

The application of a magnetron technology with ion-plasma assisting is validated for developing a new technology for nanostructurizated chrome coating on the working surfaces of titanium hydraulic cylinders instead of a...

Сomplex reflection coefficient determination using probe measurements

Complex reflection coefficient measurements are widely used in materials characterization. The aim of this paper is to develop a method for complex reflection coefficient measurement using electrical probes. For the case...

Determination of stressed-strained conditions for structure of space stage of liquid launch vehicle under longitudinal oscilla-tion

Longitudinal oscillation of liquid launch vehicle due to the longitudinal instability result in additional loads of structural elements. Those dynamic loads must be considered for the strength computations of structural...

Model Problems for Class of Systems for Mutual Positioning Spacecraft and Payload

The class of systems for mutual positioning a spacecraft and payload is considered. It can include the exist-ing systems for transportation of a payload relative to an orbital spacecraft using an anthropomorphic manipula...

Download PDF file
  • EP ID EP462459
  • DOI -
  • Views 67
  • Downloads 0

How To Cite

V. Marchenko, N. Sazina, P. Khorolskyi, A. Voznenko (2018). Model for calculating the expected cost of new rocket hardware development with account for uncertainty factors. Технічна механіка, Техническая механика, Technical Mechanics, 2(2), 30-43. https://europub.co.uk./articles/-A-462459