Multi-objective Optimization of Combined Gray-green Infrastructure Rainwater System for Yuhuazhai Depot of Xi’an Metro
Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 1
Abstract
[Objective] Acceleration of the urbanization process and frequent occurrence of urban flood disasters impose higher requirements on the rainwater system of urban rail transit depots. It is necessary to conduct a detailed study on the schemes of the depot rainwater system. [Method] Based on the rainwater management concept by combining gray infrastructure and green infrastructure, the hydrological simulation software SWMM (storm water management model) is used to simulate the hydrological processes under various combination schemes for Yuhuazhai Depot of Xi’an Metro Line 3. A multi-objective optimization method is designed through the response surface method. Combined with the particle swarm optimization algorithm, the Matlab software is used to optimize the configuration of the green infrastructure within the depot in order to achieve effective control over the total runoff volume, peak flood, TSS (total suspended solids) and costs. [Result & Conclusion] Through multi-objective optimization and comparison, the optimal gray-green combination rainwater system scheme for Yuhuazhai Depot of Xi’an Metro is determined. In particular, the combined layout of permeable pavements and retention ponds should be given priority within the depot. This scheme not only meets the requirements of GB 51345—2018 Assessment Standard for Sponge City Construction Effect, but also maximizes the economic benefits.
Authors and Affiliations
Jiajie LYU
Research on Deformation Patterns and Influencing Factors of Ten Pilot Tunnel Pile Method Construction in Large Span Metro Stations
[Objective] To ensure the construction safety of large span metro stations, it is necessary to conduct research on the deformation patterns of the station structure and the influencing factors in the construction proce...
Influence of Different Opening Positions of Shield Method Connecting Passage on Main Tunnel Segment Internal Force
Objective In the 9 m level large-diameter shield tunneling, there are no engineering cases using shield method for constructing connecting passages yet. Due to the influence of clearance and evacuation platform height, a...
Management Model of Smart Stations under Urban Rail Transit FAO Conditions
[Objective] In order to further explore the production operation and business management model in line with the actual operation of urban rail transit, ensuring the scientific process and optimization of the station ma...
Automatic Train Operation System Based on Vehicle Deep Integration
Objective Conventional ATO (automatic train operation) systems lack a direct, real-time, and bidirectional data exchange with the vehicle traction/braking systems. In the vehicle control process, information on the vehic...
Interoperation Plan for City Railway CBTC and CTCS-2
Objective The research is specially carried out aiming to meet the operational requirements for interoperability between city railway CBTC (communication-based train control) and railway CTCS-2 (China train control syste...