NIFTP: A Critical Pathologist View
Journal Title: Otolaryngology – Open Journal - Year 2017, Vol 3, Issue 1
Abstract
In the last two years, there has been an interesting discussion on NIFTP (Non-invasive folicular Thyroid neoplasm papillary-like nuclear features), the previous encapsulated folicular variant of papillary thyroid carcinoma (EFVPTC). The study of Nikiforov et al,1 laid the foundations of this new discovery, which are: a. The morphological features, i.e., the follicular growth pattern and nuclear features of papillary thyroid carcinoma (PTC); b. Lack of invasion, which separates this tumor from invasive FVPTC; c. Clonal origin determined by finding a driver mutation, which indicates that the lesion is biologically a neoplasm; and d. A very low risk of adverse outcome when the tumor is non-invasive.
Authors and Affiliations
Sydney Correia Leão
Serum Calcitonin Levels may be Used in the Differential Diagnosis of Vagal Glomus
Medullary thyroid carcinoma (MTC) is a neuroendocrine (NE) tumor and is very rarely observed. MTC originates from the parafolliculer C cell and can show various histopathological patterns. Head and neck paragangliomas ar...
Giant Parathroid Adenoma With Thoracic Extension: A Case Report
A 31-year-old female patient was addressed to our consultation for management of hypercalcemia secondary to primary hyperparathyroidism. The physical examination results were normal. The technetium sestamibi (99mTc MIBI)...
A Case of Huge Intradermal Melanocytic Nevus of the External Auditory Canal Orifice
The intradermal Melanocytic Nevus (MN) is usually referred to as the nevomelanocytic nevi and is composed of nevus cells. Although intradermal nevi are common benign pigmented skin tumors, their occurrence within the Ext...
Relationship Between Serum Vitamin D Levels and Childhood Recurrent Tonsillitis
Background: Many factors are associated with the development of recurrent tonsillitis. These include patient incompliance, premature cessation of antibiotherapy, inadequate antibiotic absorbance, bacterial tolerance, bac...
Importance of Keros Classification in Surgery
Objective: The relationship between the cribriform plate and the uncinate process may be elaborated with the help of the Keros classification. The observations were analysed using high-resolution computed tomography (HRC...