RENOVATION OF SHAFT MINING BUILDING NO. 2 IN KŁODAWA SALT MINE

Journal Title: Civil and Environmental Engineering Reports - Year 2015, Vol 2, Issue 17

Abstract

The paper presents the renovation process of the shaft mining building No. 2 situated in the Kłodawa Salt Mine. A technical state of the facility required immediate reinforcement of structural elements, which was confirmed by expertise carried out by the authors. A lack of repairs could be the cause of building damage. The progress of corrosion in some steel profiles of columns or floors was very advanced. The state of the building was rapidly worsening due to the very high salinity of the indoor environment, moisture (building not insulated) and vibrating engines of machinery operating on different floors felt throughout the facility. After carrying out the technical expertise, working plans and specifications, and relevant numerical analysis, the modernization process was realized by the reinforcement or rebuilding of structural elements.

Authors and Affiliations

Tomasz BŁASZCZYŃSKI, Przemysław WIELENTEJCZYK

Keywords

Related Articles

Effect of composite ingredients on vibration frequencies of plates made of functionally graded material

The subject of this paper are thin plates with characteristic material structure: periodic in selected direction and smoothly varying along another. The aim of the contribution is to formulate and apply averaged model de...

FEM modeling of rebar corrosion - numerical verification of experimental research

The paper presents the experimental verification of concrete cover splitting time theory based on the multicomponent media approach and FEM. The results of computer analysis are compared with the experiment presented in...

Peaking factors of dry weather flows in Głogów combined sewage system

This paper presents the results of dry weather flowrate studies in inflow and outflow channels of overflow structure PB-1. The facility is located in P.Skargi Street in Głogów. Based on the results the average daily peak...

Predicting bending moment in crown of soil-steel structure built as ecological crossing for animals

The paper concerns soil-metal structures made of a thin shell (usually - corrugated steel) and soil backfill. During backfilling significant deformations of the structure can be observed (the upper part of the shell buck...

METHODS OF TESTING AND ASSESSING THE TECHNICAL CONDITION OF CHOSEN BUILDING STRUCTURES LOCATED IN THE AREA OF THE AUSCHWITZ-BIRKENAU STATE MUSEUM IN OŚWIĘCIM

The results presented in this article consider the means of assessing the technical condition of two selected buildings, i.e. prisoner barracks number 123 and 124, located at the Auschwitz-Birkenau State Museum in Oświęc...

Download PDF file
  • EP ID EP239703
  • DOI -
  • Views 62
  • Downloads 0

How To Cite

Tomasz BŁASZCZYŃSKI, Przemysław WIELENTEJCZYK (2015). RENOVATION OF SHAFT MINING BUILDING NO. 2 IN KŁODAWA SALT MINE. Civil and Environmental Engineering Reports, 2(17), 15-23. https://europub.co.uk./articles/-A-239703