Abstract
[Objective] The B-TrunC (broadband trunking communication) network of Shanghai Metro adopts the architecture of multi-line shared hot standby trunking core network, which needs access to the base stations and terminals of multiple lines from different vendors. In order to realize network interconnection, it is necessary to standardize the design of the interface protocol between the trunking core network and the base station/terminals. [Method] On the basis of B-TrunC standards, some interface protocols between the trunking core network and base stations/terminals are refined and supplemented. For the hot standby trunking core network, the interface between the trunking core network and the base stations needs to supplement the switchover process protocols between the main and the standby trunking core networks. Based on a comprehensive analysis of the advantages and disadvantages of the above two existing switchover schemes, the optimized functional requirements and process protocols are proposed. To meet the requirements for interconnection of terminals trunking functions, the detailed configuration schemes of relevant protocols are proposed to realize the interconnection of the functions including terminal loading call groups, centralized audio and video recording, and multimedia messaging. [Result & Conclusion] After supplementing and refining the interface protocols, the B-TrunC hot standby trunking core network of Shanghai Metro connecting with the base station/terminals of two vendors, realizes not only the corresponding switchover of all base station/terminals accompanying the switchover of the core network, but also the interconnection of the functions including trunking call, real-time short data, and multimedia messaging. It breaks through the key technical bottleneck of B-TrunC network resource sharing.
Authors and Affiliations
Wenli JI, Sen WANG, Zhipeng XU
Mechanical Performance Analysis and Profile Optimization of Pre-bent Steel-concrete Composite Straddle Monorail Track Beams
[Objective] Most conventional straddle monorail track beams utilize a profile form with 850 mm width. In response to the urban rail transit construction demands of the third and fourth-tier cities in China, relevant ente...
Correlation Analysis of Evaluation Indicators for Shield Tail Sealing Grease Waterproof Performance
Objective The performance of shield tail grease significantly influences the effectiveness of the shield tail waterproof seal. While there are numerous performance indicators for shield tail grease, the relationship betw...
Urban Rail Transit ATO and TCMS Functionality Integration Design
Objective Based on the basic functions of ATO (automatic train operation) and TCMS (train control and monitoring system), adopting an integrated design approach can simplify repititive designs and optimize train control...
Application Research on Vehicle-ground Integrated Sensing System of Suzhou High-tech Zone Tram
Objective In the semi-independent right-of-way operation scenario of the tram, there exists the potential risk of pedestrians or vehicles entering the track area, especially in the intersection area. The sensing system d...
Tunnel Cross-section Optimization Design in Upper-soft Lower-hard Composite Strata Based on Lining Structure Minimum Bending Moment
Objective To effectively prevent lining damage and water leakage in tunnels, research is carried out on minimizing lining structure bending moment for tunnel cross-section in upper-soft lower-hard composite strata. Metho...