Optimization groundconcrete composition for filling of underground workings

Abstract

Construction of buildings and structures in Odessa region is complicated by the presence of large areas of soil subsidence and undermined territories of underground mine workings (catacombs). They generate a high probability of surface failures. Therefore, the elimination of the old underground workings, when increasing height of newly built residential buildings and loads on foundations, is a current goal. The goal is to use clay (waste production of clay rock) for making concrete and the laying of underground mining, clusters, voids, and fractures. To exclude the deformation of the surface, to provide normal operation of internal and external engineering networks with laying-out of worked-out areas. Eliminating the pores and voids of the underground mine workings is to ensure the operational reliability of buildings and structures in the region of seismic resistance up to 7 points. To ensure the durability of construction objects, located above the mine workings. Objectives of research: develop formulations and study the properties of backfill material for the elimination of excavations. Methods of lightweight concrete selection according to requirements of normative documents. Two basic requirements are presented: the workability of the concrete mix supplied the concrete pipe and concrete strength grades in the range of 15-25. The factors, determining the performance of mix and concrete, are studied: mobility, composition, water-cement ratio, the presence of the filler and the increase of concrete strength with time. The results of the studies: compositions of soil cement with mobility OK=12-14 cm on Strasznie cone, intended for transportation of concrete pumps pipes are selected. On their basis concrete in the range of grades M15-35 with a consumption on 1 m3 of soil cement was obtained: loam 1m3 (1000 kg) of Portland cement grade 400, in the range of 80-175 kg/C=3,5-6,0.

Authors and Affiliations

M. V. , Mitinskaya, A. , Kucherenko, T.A. , Suchecka

Keywords

Related Articles

{Methods and development analysis of a way for determining the efficiency of wooden structures fire protection

A literature review and analysis of fire protection means of wooden structures has been carried out. It has been established that there is a certain amount of rapid methods for determining fire-protection efficiency, whi...

The analysis of the development features of the municipal heat and power engineering in Ukraine. Energy saving aspect

The equipment, a significant part of which is worn out and operates with low indicators of technological efficiency has been used in the Ukrainian communal heat and power engineering. The aim of the study is to analyze p...

Theory of axi-symmetric dimensional solids

The actual software for the calculation of building constructions is based on universal numerical methods. The obtained numerical results should be additionally checked for their reliability and accuracy. The experimenta...

Diagnostics and repairs of concrete pavement runway section of Lviv Danylo Halytskyi international airport

In 2010-2012, in the framework of preparation for the Euro 2012 football championship, a complete reconstruction of the airport «Lviv» was carried out with the installation of airport runway of 3305 m long and 45 + 2×1.5...

The use of pressure flotation in the water treatment stations

Classical technological schemes for the purification of natural waters become ineffective against pollutants, whose presence in water or increase in their concentration has not been taken into account in the design. The...

Download PDF file
  • EP ID EP317485
  • DOI -
  • Views 152
  • Downloads 0

How To Cite

M. V. , Mitinskaya, A. , Kucherenko, T. A. , Suchecka (2017). Optimization groundconcrete composition for filling of underground workings. Вісник Одеської державної академії будівництва та архітектури, 1(66), 79-85. https://europub.co.uk./articles/-A-317485