Abstract
[Objective] The resource sharing among main substations in urban rail transit power supply system can lead to significant cost savings. In this context, it is essential to investigate reactive power compensation schemes for different phases of main substation resource sharing to ensure that the power factor at the PCC (point of common coupling) meets the standards. [Method] Taking the power supply system of a city's metro line as example, based on the train schedule and power supply system structure, the minimum reactive power compensation required at PCC before and after main substation resource sharing under daily power factor compliance is calculated. A reactive power compensation setting scheme considering main substation resource sharing is proposed, based on the minimum reactive power compensation that meets the compensation requirements before and after main substation resource sharing, with the goal to minimize SVG (static var generators) capacity, determining the installation capacity of SVG and reactor or capacitator. [Result & Conclusion] In the power supply system of the case study line, the actual configuration of the reactive power compensation devices for the 1# main substation main transformer power supply zone is as follows: reactor capacity is 6.0 Mvar, and SVG capacity is 1.0 Mvar. For the 2# main transformer power supply zone, the configuration is a reactor capacity of 3.0 Mvar and an SVG capacity of 0.5 Mvar. The proposed reactive power compensation scheme replaces a total capacity of 9.0 Mvar SVG devices with reactors, meeting the reactive power compensation requirements while reducing investment costs.
Authors and Affiliations
Liying LI, Dan ZHOU, Shan LIN, Dayun ZOU, Haiqi JIN, Kai XIE, He QI, Jian ZHANG
Simulation Analysis of Segment Joint Deformation and Waterproof Performance under High-speed Train Vibration in Large-diameter Shield Tunnel
Objective To prevent water leakage issues in large-diameter shield tunnel, ensure high-speed train operational safety and normal tunnel functionality, it is necessary to carry out analysis and research on tunnel segment...
Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4
Objective During the evolution of existing DCS (data communication subsystem) towards a dual-mode four-network system in the major signaling system renovation project of Shanghai Rail Transit Line 3 and Line 4, there is...
Control Circuit Optimization for High-speed Circuit Breaker in Traction System of Jinan Metro Line 3
[Objective] In the early operation stage of Jinan Metro Line 3, multiple sporadic high-speed circuit breaker closing failures are reported. To improve the reliability of train operation, it is necessary to optimize the h...
Research on Embedded Track System Vibration Transmission
Objective Embedded tracks have relatively high damping, providing good vibration and noise reduction performance. Therefore, it is necessary to study the vibration reduction mechanism of embedded track system. Method Tak...
Mechanical Behavior of Urban Rail Transit Station Structure Based on Existing Shield Tunnel Interval Underground Excavation Construction
Objective Cancer Hospital Station on Shenzhen Rail Transit Line 14 adopts a scheme of large-diameter (8.5 m) shield tunnel expansion featuring tunnel-first and station-later. During the connection of the main station str...